Xe Namnoy 6 Dam Hydropower Info - by Hobo Maps - Go to Hydropower Projects Page - - - Home

Xenamnoy 6 Hydropower project is located on the Boloven Plateauin in Paksong District of Champasak Province in southern Lao PDR.

XeNamnoy is pronounced like "Say nam noy".

Xenamnoy 6 Hydropower project location coordinates are 15°08'03.0"N 106°40'40.0"E (15.134167, 106.677778) as shown in satellite image below:

Xenamnoy 6 HPP is close to XeNamNoy 1 HPP and both are on satellite image below:

XeNamNoy 6 HPP is also close to XeKatam 1 HPP where the XeKatam River merges into the XeNamNoy River as seen below:

3 hydro projects within 9 km of each other - XeNamNoy 1 & 6 and XeKatam 1 .

Xe Namnoy 6 powerhouse images below - powerhouse is at coordinates 15°08'12.6"N 106°38'39.3"E (15.136833, 106.644250):

Weir and head pond are at coordinates - 15°09'26.6"N 106°39'02.1"E (15.157389, 106.650583):

The Xenamnoy 6 Hydro project is a run-of-river hydropower project. The nominal installed capacity is 5 MW and the nameplate installed capacity is 4.918 MW. Annual electricity output for the project is 18.5 GWh for delivery to EDL.

The project includes fixed weir, sand flush, intake structure, headrace channel, head tank, penstock, powerhouse with 2 units of turbine (2 x 2.459 MW) and a tailrace.

The project was originally developed by Phongsubthavy Road & Bridge Construction Co., Ltd. but later incorporated into Xe Nam Noy 6 Hydropower Company Limited which in turn is now 100% owned by Chaluen Sekong Power Co., Ltd.

Xenamnoy 6 Hydropower project cost was estimated at only US$ 12 million.

Xenamnoy 6 Hydropower turbines and controls below:

Xenamnoy 6 site images below:

Xenamnoy 6 Hydropower project history below:

  1. On May 22, 2015 Environmental Certificate from the Department of Natural Resources and Environment.
  2. On March 16, 2017 the initial detailed design certificate.
  3. March 16, 2017 approved the completion of the project.
  4. On January 11, 2018, the concession certificate was issued.
  5. On September 10, 2013 Granted state land use rights.
  6. On December 22, 2014 Project management agreement with Champassak Provincial Department of Resources.
  7. On September 30, 2016, a business transfer agreement was signed between TK Group Co., Ltd. and Chaluen Sekong Power Co., Ltd.

Companies and contractors:

Project Owner: Xe Nam Noy 6 Hydropower Company Limited.

Design study by: Phongsubthavy Construction Company. Monitors By: Phongsubthavy Construction Company.

Phongsubthavy Construction Company hired Dong Fang Company.

Machinery buyer: Phongsubthavy Construction Company.

Manufacturer & Installer of electric machinery: MECAMIDI Co.; Ltd.

Construction of 115 kw transmission line: Union Trading Co., ltd

Transformers and Generators MECAMIDI Co.; Ltd & Trex Co., Ltd

CDM PROJECT

XeNamnoy 6 Hydropower project is intended to qualify as a greenhouse-gas-reducing Clean Development Mechanism (CDM) project under the Kyoto Protocol and receive carbon reduction credits since its clean green production may displace "dirty" polluting power plant production. View or download the CDM application document HERE .

Note: The words "Xe" and "Nam" can both mean "river" and a term such as "Nam XeNamnoy" is not used.